Differential pressure Issue:

After completing a well for both Tubing and casing flow, it was observed that Oil is produced through the tubing while gas is produced through the casing. This situation indicates a differential pressure issue within the well system, which can lead to inefficient production and potential safety concerns. Understanding the root cause of this problem is crucial in order to implement effective solutions and optimize the well’s performance.

One possible cause of the differential pressure issue could be related to the reservoir characteristics, such as the presence of gas cap or water drive mechanisms. If the reservoir contains a significant amount of gas, it can lead to gas breakthrough in the casing, resulting in gas production through the casing instead of the intended oil production through the tubing. In such cases, reservoir modeling and analysis are essential to better understand the reservoir behavior and its impact on well production.

Another potential cause of the problem could be related to the completion design and wellbore configuration. Improper zonal isolation between the tubing and casing sections can allow gas to migrate into the casing, causing gas production issues. Inadequate Cementing or faulty packer Seals can also contribute to this problem. Conducting a thorough evaluation of the well completion design and integrity is necessary to identify any potential leaks or breaches that may be causing the differential pressure issue.

steel piping Chinese best ManufacturersFurthermore, operational factors such as production rates, fluid properties, and wellbore conditions can also influence the differential pressure within the well. Variations in flow rates or changes in fluid composition can impact the pressure distribution between the tubing and casing, leading to the observed production discrepancies. Monitoring and analyzing production data, pressure profiles, and fluid samples can help in diagnosing the specific factors contributing to the issue.

alt-786

To rectify the differential pressure problem and restore optimal production from both tubing and casing, several remedial actions can be considered. Implementing zonal isolation techniques such as cement squeeze jobs or mechanical barriers can help prevent gas migration and ensure proper fluid flow pathways. Remedial cementing or re-perforation of the wellbore can also be performed to enhance zonal isolation and address any integrity issues.

Additionally, adjusting production parameters such as choke settings, tubing pressures, or artificial lift methods can help balance the production between Oil and Gas streams. Installing downhole equipment such as gas lift valves or Packers can aid in controlling the flow dynamics and optimizing production from the well. Regular well monitoring and surveillance are essential to assess the effectiveness of the implemented solutions and make further adjustments as needed.
https://youtube.com/watch?v=yRqVb0LdTVk
In conclusion, addressing a differential pressure issue in a well system requires a comprehensive understanding of the underlying causes and a systematic approach to implementing corrective measures. By conducting thorough reservoir analysis, evaluating completion integrity, and optimizing production operations, the problem of oil production through tubing and gas production through casing can be effectively resolved, leading to improved well performance and productivity.